Hitachi Electronics Manufacturing Facility

Hitachi 003 580

Hitachi Automotive Systems teamed with Bristol design professionals to envision a premier facility to house their growing electronic control module (ECM) business.

Read more: Hitachi Electronics Manufacturing Facility

UPS Logistics

ups logistics 580

This 400,000 sq.ft. tilt-up distribution center in Elizabethtown, Kentucky is the first of several similar structures proposed for this site. The shell was completed during a harsh winter in 5 months.

Read more: UPS Logistics

Toyotetsu America Inc. 1600T Press Pit

TTAI Press Pit1

This project is a demonstration of the efficiency of the Design/Build process. Bristol Group engineered and self-performed excavation, concrete and structural steel for this 1600 ton transfer press foundation. The schedule was maintained in spite of the discovery and correction of unsuitable backfill conditions under the existing slab.

Read more: Toyotetsu America Inc. 1600T Press Pit

Osram Sylvania Phosphorous Recycling Facility

Bristol Group once again was called upon by this repeat customer to construct a new 7,500-square-foot facility to house state-of-the-art recycling machinery to reclaim the phosphorous coating on the interior side of fluorescent light bulbs.

Read more: Osram Sylvania Phosphorous Recycling Facility

J.M. Smucker Warehouse Expansion

Smucker 3748

Bristol was awarded the 15,000 square foot expansion of the J.M. Smuckers facility in Lexington. Close coordination and precise sequencing of work activities was necessary to ensure minimal disruption to the owner’s ongoing operations. The project required 10’ of unsuitable soils removal and replacement beneath the entire building foot-print. This work was completed on schedule despite difficult winter conditions.

Read more: J.M. Smucker Warehouse Expansion

Page 1 of 4