Astemo needed additional warehouse space at its South Plant facility in Berea, Kentucky. Due to site constraints, the expansion had to be constructed over an existing detention basin.
Bristol Group filled the existing detention basin and constructed a retaining wall to establish the required building grade. The footing, retaining wall, and concrete floor slab were structurally tied together, creating a unified system that strengthened the overall building structure and provided a solid foundation for the expansion.
The warehouse expansion provided Astemo with additional inventory capacity, helping the company keep pace with rising demand.