DESIGN-BUILD CASE STUDIES
The completion of each Bristol Built project is more than just effective design-build construction. We believe that our business is a service, not a commodity. We specialize in approaching complex project challenges that are often already over-budget and finding a way to fast-track them to cost-effective, highly durable, attractive facilities. Take a look at a few of the solutions we’ve provided for several construction projects in challenging situations.
Our WOrk
Case Studies
TOA SE Expansion
- Square Feet: 17,500
- Project Duration: 2024
- Location: Nicholasville, Kentucky
Cincinnati Logistics Park Airportwest (CLPAW)
- Square Feet: 504,688
- Project Duration: 2024
- Location: Burlington, Kentucky
Baptist Health Centralized Pharmacy
- Square Feet: 100,000
- Project Duration: 2023
- Location: La Grange, Kentucky
ANP ENERTECH Electric Vehicle Component Manufacturing Facility
- Square Feet: 65,000
- Project Duration: 2023
- Location: Elizabethtown, Kentucky
Plumbers Supply
- Square Feet: 50,000
- Project Duration: 8 Months
- Location: Bowling Green, Kentucky
Parkview Medical Plaza
- Square Feet: 46,500
- Project Duration: 9 Months
- Location: Georgetown, Kentucky