Proven Results
DESIGN-BUILD CASE STUDIES
The completion of each Bristol Built project is more than just effective design-build construction. We believe that our business is a service, not a commodity. We specialize in approaching complex project challenges that are often already over-budget and finding a way to fast-track them to cost-effective, highly durable, attractive facilities. Take a look at a few of the solutions we’ve provided for several construction projects in challenging situations.
Our WOrk
Case Studies
Cincinnati Logistics Park Airportwest (CLPAW)
- Square Feet: 504,688
- Project Duration: 2024
- Location: Burlington, Kentucky
Central Motor Wheel of America
- Square Feet: 266,000
- Project Duration: 13 Months
- Location: Paris, KY
Baptist Health Centralized Pharmacy
- Square Feet: 100,000
- Project Duration: 2023
- Location: La Grange, Kentucky
City Center Marriott Hotel
- Square Feet: 291,660
- Project Duration: 5 Months
- Location: Lexington, KY
Hitachi Automotive Systems Expansion
- Square Feet: 150,000
- Project Duration: 4 Months
- Location: Berea, KY
BlueSky Logistics
- Square Feet: 250,000
- Project Duration: 7 months
- Location: Louisville, KY