ANP ENERTECH Electric Vehicle Component Manufacturing Facility
- Square Feet: 65,000
- Project Duration: 2023
- Location: Elizabethtown, Kentucky
To meet the increased demands of the automotive industry, Metalsa needed to construct a 76-foot-tall addition to their manufacturing building without interrupting their current production. Access to the site was limited and navigating the site through constant truck traffic made the project even more complex.
Bristol Group was hired to design and construct the project. The collaboration of Bristol’s construction professionals and in-house design team fostered solutions that allowed Metalsa to stay in full production with no impact to their manufacturing process.
The owner was able to move into their space on time and produce the parts for the automotive industry to meet their demand.