Hitachi Automotive Systems
- Square Feet: 180,000
- Project Duration: 6 Months
- Location: Harrodsburg, KY
TOA SE needed additional space to support growth and improve workflow efficiency within their existing Nicholasville facility. The challenge was to design and construct an expansion that integrated seamlessly with their current operations while keeping production running smoothly throughout construction.
Bristol Group provided a complete design-build solution for the 17,500 SF expansion, managing all aspects from planning and permitting through construction. The team coordinated closely with the client to phase work around ongoing operations, ensuring minimal disruption. Emphasis was placed on quality, safety, and maintaining schedule commitments throughout the project.
The completed expansion provides TOA SE with the additional space needed to increase capacity and improve operational flow. The project was delivered on schedule and within budget, positioning the client for continued growth and efficiency in their operations.